Click here to REGISTER ONLINE


Our Reference:  

                                       COWAM/TEC/ONLINE_ZOOM WEBINAR/26.07.2022/06


Who Should Attend :


          REGISTERED INSPECTOR OF WORKS (BEM),

          SITE SUPERVISOR, PROJECT COORDINATOR, SITE ENGINEER,

 OR PARTICIPANT WHO INVOLVE IN CONSTRUCTION INDUSTRIES.

 

Working Background : 

CIVIL STRUCTURE, MECHANICAL AND ELECTRICAL.

 

Dear All INVITATION FOR SEMINAR.


We would like to invite all participant listed as above to joint our half day Seminar “BIOGASS SYSTEM: Case Study of Malaysia Sewerage System”. The agenda information about the seminar as below:

 

Date

:

26 JUL 2022, TUESDAY.

 

Time

:

2.00 PM - 5.00 PM.    

(HALF DAY EVENING SESSION).

 

Venue

:  

ONLINE - ZOOM MEETING WEBINAR.

 

Speaker 

:    

Ir KANNAN SENDRASARAN.                    M&E MANAGER,                              B. ENG (HONS) IN ELECTRICAL AND ELECTRONIC,                              REGISTERED ELECTRICAL ENERGY MANAGER (REEM).                               

  

Organised by   :     CONSTRUCTION INSPECTOR OF WORKS ASSOCIATION MALAYSIA(COWAM). 
  
                                                    
             Participant Certificate  : WILL ISSUE BY COWAM UPON REQUEST.

            Target Participant : LIMITED TO 100 PARTICIPANTS ONLY.

            Fee Charged  :  FREE TO ATTEND/e-CERT WILL CHARGE AS BELOW UPON                 REQUEST:            

                             - RM 40.00 (ACTIVE MEMBER). 

                             - RM 80.00 (PASSIVE/NON-MEMBER).

 

     CPD Point  :  BEM - 3 CPD .

     Last date of registration : 18 JUL 2022,MONDAY.

  

SPEAKER BACKGROUND.


         Ir. Kannan Sendrasaran is a M&E Manager at Langat Centralized Sewage Treatment Plant (CSTP). He graduated with B.Eng. (Hons) in Electrical and Electronics from UCSI University Malaysia. He is a registered Professional Engineer with Board of Engineers Malaysia (BEM) and a Registered Electrical Energy Manager (REEM) with Energy Commission Malaysia. He has more than 13 years of working experience covering design, contract administration, project management and consultancy in electrical, SCADA and instrumentation services. He has been involved in operation and maintenance of Water Treatment Plant and Sewerage Treatment Plant. He is currently undertaking research and studies on ways to save energy, reduce maximum demand and cost saving in industrial sector by optimizing the process line and utilizing renewable energy sources.


                                                                             SYNOPSIS.

                Malaysia's electricity consumption demand continues to rise year after year. The majority of Malaysia's energy sources are non-renewable, such as crude oil, petroleum products, natural gas, coal, and coke. Renewable energy (RE) has the potential to be an alternative source of energy production, and Malaysia has a large potential for RE penetration. Hydropower, solar, wind, mini-hydro, biomass, and biogas are examples of renewable energy technologies. RE is expected to become one of the most promising sources of energy for the electric grid in the coming decade.

Malaysia has also committed to a 20 percent renewable energy mix by 2025, in accordance with the Paris Agreement. In Malaysia, the primary energy supply is contributed by five main sources, namely natural gas, coal, crude oil, petroleum and renewable energy which includes hydropower. The biogas system in a sewerage treatment plant in Malaysia is a highly beneficial endeavor for reducing peak demand and energy saving during plant operation. Sludge from process treatment is used to generate biogas and power.

Engineers has important role in study the capacity of a sewerage treatment plant and designing a Biogas System with more applications. The Site Supervisor and Inspector of Works (IOW) execute their duties correctly and attentively during the construction at the site. They must understand the design, system products, installation method or technique, and inspect installation and identify faults or contractor mistakes. This enables them to advise workers on how to properly complete the installation correctly, adhere to all safety rules & regulations and avoid on-site accidents.


TENTATIVE PROGRAMME.

 Date : 26 JUL 2022, TUESDAY (02:00PM – 05:00PM). 


 

TIME


TOPIC


1.50PM–2.00PM

Registration of Participant.

2.00PM–2.45PM

Introduction to Sewage Treatment Plant in Malaysia.

2.45PM–3.45PM

Anaerobic Digester Tank and Biogas System

3.45PM–4.45PM

Operation and Optimization of Biogas Energy System

4.45PM–5.00PM

Q&A Session.

       

         ---------------------------------------------- END ---------------------------------------------