Our Reference:
COWAM/TEC/ONLINE_ZOOM WEBINAR/11.06.2022/02
Who Should Attend :
REGISTERED INSPECTOR OF WORKS (BEM/LAM),
SITE SUPERVISOR, PROJECT COORDINATOR, SITE ENGINEER,
OR PARTICIPANT WHO INVOLVE IN CONSTRUCTION INDUSTRIES.
Working Background :
CIVIL STRUCTURE, MECHANICAL, ELECTRICAL AND ARCHITECTURAL.
Dear All : INVITATION FOR SEMINAR.
We would like to invite all participant listed as above to joint our half day Seminar “INTRODUCTION TO PASSIVE FIRE PROTECTION: Compartment, Fire Door and Staircase According to BOMBA Act and UBBL”. The agenda information about the seminar as below:
|
Target Participant : LIMITED TO 100 PARTICIPANTS ONLY.
Fee Charged : FREE TO ATTEND/e-CERT WILL CHARGE AS BELOW UPON REQUEST:
- RM40.00 (ACTIVE MEMBER).
- RM 80.00 (PASSIVE/NON-MEMBER).
CPD Point : WILL APPLY BY COWAM (BEM).
Last date of registration : 03 JUN 2022,FRIDAY.
SPEAKER BACKGROUND.
Ar. Iznny Ismail received her
Bachelor of Architecture and Diploma in Architecture from UiTM Seri Iskandar
and Shah Alam. Iznny has been worked with Noorhashima n Noordin Architect after
graduating in 2008. Later she joined Arkitek Azman Zainonabidin in Perak and
practice for 6 years. Iznny has been involved in several projects mainly,
institutions, offices and housing. In 2014 she establishes her own practice of
Iznny Ismail Architect.
She believes to be
innovative in delivering architectural designs by translating functional and
appealing design sensibility. While practicing, she is also an academician of
UiTM Seri Iskandar since 2015. She has an interest in leveraging knowledge by
exploring technological design correspond to practicality and purposeful.
Besides practicing and teaching, Iznny is a volunteer and part of the Technical
Team for Mercy Malaysia since 2009 and had involved several missions locally in
flood response in Perak and internationally for Gempa in Padang, Indonesia. She
has a high spirit towards the volunteers in humanitarian aid by sharing
technical expertise. In addition, she is part of Kelab Pembangunan
Profesionalisme Arkitek Kuala Lumpur dan Selangor (Be: Ar) as an alumni by
passing knowledge of professional paper (PT3) to candidates.
In supervising passive fire protection need to understand the design and fire safety concept. The supervision is involved from the start towards the end of the construction works. It requires implementation of the passive fire design, the BOMBA approval and to making it a reality by construction of the building.
Proper installation and workmanship by third party really needed to avoid defects in passive fire protection. Defects arise as building occupied post construction with amendments to the building use. The changes involve structural modifications or additional mechanical and electrical services, all that may impact the initial design of the passive fire protection for the building. Hidden features such as penetration seals, ductwork and smoke vents need to be properly inspected.
TENTATIVE PROGRAMME.
Date : 11 JUN 2022, SATURDAY (02:00PM – 5:00PM).
TIME | TOPIC |
1.50PM – 2.00PM | Registration of Participant. |
2.15PM – 3.15PM | Understanding the Passive Fire Protection. |
3.15PM – 3.30PM | BREAK (15 MINUTES) |
3.30PM – 4.45PM | Implementation of the Passive Fire Protection |
4.45PM – 5.00PM | Q&A Session. |
---------------------------------------------- END ---------------------------------------------
0 Comments